October 14, 2001  

Stucco Done, Scaffolding Down, Tile Work Begins

Picture 1 Standard side shot

Picture 2 Best looking angle 

Picture 3 Looking up at basement, Sliding glass door on right, window on left. 

Picture 4 Looking up at basement, Sliding glass door on right, window on left. 

Picture 5 From back of house, looking at Family room, garage on left, basement on right 

Picture 6 Looking down at garage 


I had and needed a lot of help with the electrical

Kitchen Island ready for tile work.  Notice the granite slab waiting for installation

Kitchen Sink This is what will go in the island

Painted doors waiting to be hung back up

Brick Hearth for the wood burning stove

Go back to home

Last Updated 14-October-2001