October 14, 2001
Stucco Done, Scaffolding Down, Tile Work Begins
Picture 1 Standard side shot
Picture 2 Best looking angle
Picture 3 Looking up at basement, Sliding glass door on right, window on left.
Picture 4 Looking up at basement, Sliding glass door on right, window on left.
Picture 5 From back of house, looking at Family room, garage on left, basement on right
Picture 6 Looking down at garage
I had and needed a lot of help with the electrical
Kitchen Island ready for tile work. Notice the granite slab waiting for installation
Kitchen Sink This is what will go in the island
Painted doors waiting to be hung back up
Brick Hearth for the wood burning stove
Go back to home |
Last Updated 14-October-2001 |