July 11, 2001  

Roof 95% Done! Electrical, Plumbing, HVAC underway

(The time I have been dreading is here, time to do the electrical)

Picture 1 Standard side shot

Picture 2 Looking up at basement, Sliding glass door on right, window on left. 

Picture 3 Looking up at basement, Sliding glass door on right, window on left. 

Picture 4 From back of house, looking at Family room, garage on left, basement on right 

Picture 5 Looking down on the garage 


I had and needed a lot of help with the electrical

Typical Box What we've been doing for two weeks!

Mast Merrill Jolley and Me cutting a hole in my garage roof for a mast to hold flood lights.

J.R. and Serena Jolley helped immensely.

Robert Longo Blasted through the lights and switches for the second floor.

John Pfeiffer Hangs the chandelier box over the stairs.  I selected  a person not afraid of heights for this job.

Mena Can't stand a messy house, completed or otherwise.

Richard III is helping me pull data, voice, and video cable late at night-Still has a smile on his face!